Speedometer Cable labor time
Speedometer Cable takes about 1.8 hr of shop labor on a typical vehicle. Across 15,010 vehicle and engine combinations from 56 makes, most fall between 1.5 and 2.0 hours, and the longest take up to 2.7 hours. Cadillac, Lincoln and Land Rover vehicles tend to take the longest; Genesis, Freightliner and Daewoo the least. The exact time depends on your car, so look yours up below or pick it on the home page.
Enter a rate to see the labor cost of each job. Many US shops charge somewhere between $100 and $200 an hour.
At $150 an hour, labor for this job is usually $225 to $300, about $270 on a typical vehicle. Parts are extra.
How long it takes across all vehicles
Hours, in half hour steps. Each bar is how many vehicle and engine combinations fall in that range.
Speedometer Cable time on popular vehicles
Speedometer Cable time by make
| Make | Typical | Most vehicles | Vehicles |
|---|---|---|---|
| Cadillac | 2.3 hr | 2.3 to 2.3 | 332 |
| Lincoln | 2.3 hr | 2.3 to 2.3 | 115 |
| Land Rover | 2.3 hr | 0.9 to 2.3 | 25 |
| Mercedes-Benz | 2.0 hr | 2.0 to 2.3 | 420 |
| BMW | 2.0 hr | 2.0 to 2.3 | 262 |
| Porsche | 2.0 hr | 2.0 to 2.3 | 177 |
| Volvo | 2.0 hr | 2.0 to 2.2 | 155 |
| Audi | 2.0 hr | 2.0 to 2.2 | 109 |
| Acura | 2.0 hr | 2.0 to 2.0 | 56 |
| Jaguar | 2.0 hr | 2.0 to 2.3 | 56 |
| Lexus | 2.0 hr | 2.0 to 2.3 | 54 |
| Alfa Romeo | 2.0 hr | 2.0 to 2.0 | 47 |
| Infiniti | 2.0 hr | 2.0 to 2.3 | 29 |
| Chevrolet | 1.8 hr | 1.5 to 1.8 | 2,045 |
| Dodge | 1.8 hr | 1.5 to 1.8 | 1,597 |
| GMC | 1.8 hr | 1.5 to 1.8 | 1,056 |
| Plymouth | 1.8 hr | 1.5 to 1.8 | 691 |
| Pontiac | 1.8 hr | 1.5 to 1.8 | 690 |
| Buick | 1.8 hr | 1.5 to 1.8 | 586 |
| Oldsmobile | 1.8 hr | 1.5 to 1.8 | 532 |
| Mercury | 1.8 hr | 1.5 to 1.8 | 431 |
| Chrysler | 1.8 hr | 1.5 to 1.8 | 373 |
| Studebaker | 1.8 hr | 1.5 to 1.8 | 67 |
| Ram | 1.7 hr | 0.8 to 1.8 | 104 |
| Ford | 1.5 hr | 1.1 to 1.8 | 1,873 |
| Toyota | 1.5 hr | 0.7 to 1.7 | 532 |
| Jeep | 1.5 hr | 1.5 to 1.8 | 404 |
| Volkswagen | 1.5 hr | 1.5 to 1.5 | 351 |
| Mazda | 1.5 hr | 1.5 to 1.5 | 262 |
| Nissan | 1.5 hr | 1.5 to 1.5 | 261 |
| Mitsubishi | 1.5 hr | 1.5 to 1.5 | 182 |
| Honda | 1.5 hr | 0.7 to 1.5 | 173 |
| AMC | 1.5 hr | 1.5 to 1.8 | 166 |
| Isuzu | 1.5 hr | 1.5 to 1.5 | 124 |
| Subaru | 1.5 hr | 1.5 to 1.5 | 117 |
| Saab | 1.5 hr | 1.5 to 1.7 | 70 |
| MG | 1.5 hr | 1.5 to 1.5 | 68 |
| Fiat | 1.5 hr | 1.5 to 1.5 | 53 |
| Hyundai | 1.5 hr | 1.5 to 1.5 | 46 |
| Peugeot | 1.5 hr | 1.5 to 1.5 | 46 |
| Eagle | 1.5 hr | 1.5 to 1.5 | 41 |
| Geo | 1.5 hr | 1.5 to 1.5 | 37 |
| Saturn | 1.5 hr | 1.5 to 1.5 | 37 |
| Suzuki | 1.5 hr | 1.5 to 1.5 | 34 |
| Kia | 1.5 hr | 0.6 to 1.5 | 29 |
| Renault | 1.5 hr | 1.5 to 1.5 | 28 |
| Opel | 1.5 hr | 1.5 to 1.5 | 20 |
| Morgan | 1.5 hr | 1.5 to 1.5 | 15 |
| Daewoo | 1.5 hr | 1.5 to 1.5 | 5 |
| Freightliner | 1.0 hr | 1.0 to 1.0 | 10 |
| Genesis | 0.7 hr | 0.6 to 0.7 | 6 |
Other electrical repairs
- Wiper Linkage
- Wiper Motor - Front
- Side Mirror Assembly
- Wiper Switch
- Headlight Assembly
- Washer Reservoir
- Tail Light Bulb
- Combination Switch
- Subwoofer
- Battery Cable - Negative
- Battery Cables - Both
- Speaker - Dash
Hours are flat-rate labor time: what a shop bills for the job when a professional technician does it. Figures come from the Open Labor Project database (how the data is built).