Supercharger labor time
Supercharger takes about 11.7 hr of shop labor on a typical vehicle. Across 364 vehicle and engine combinations from 23 makes, most fall between 9.8 and 15.2 hours. Mercedes-Benz, Land Rover and Cadillac vehicles tend to take the longest; Nissan, Pontiac and Mazda the least. The exact time depends on your car, so look yours up below or pick it on the home page.
Enter a rate to see the labor cost of each job. Many US shops charge somewhere between $100 and $200 an hour.
At $150 an hour, labor for this job is usually $1,470 to $2,280, about $1,755 on a typical vehicle. Parts are extra.
How long it takes across all vehicles
Hours, in half hour steps. Each bar is how many vehicle and engine combinations fall in that range.
Supercharger time on popular vehicles
Supercharger time by make
| Make | Typical | Most vehicles | Vehicles |
|---|---|---|---|
| Mercedes-Benz | 15.2 hr | 12.7 to 15.2 | 43 |
| Land Rover | 15.2 hr | 12.7 to 15.2 | 41 |
| Cadillac | 15.2 hr | 15.2 to 15.2 | 23 |
| Jaguar | 15.2 hr | 15.2 to 15.2 | 12 |
| Audi | 12.7 hr | 12.7 to 12.7 | 49 |
| Porsche | 12.7 hr | 12.7 to 12.7 | 13 |
| Chevrolet | 11.7 hr | 6.5 to 11.7 | 46 |
| Dodge | 11.7 hr | 11.7 to 11.7 | 28 |
| Ford | 11.7 hr | 11.7 to 11.7 | 12 |
| Buick | 9.8 hr | 9.8 to 9.8 | 37 |
| Mini | 9.8 hr | 9.8 to 9.8 | 13 |
| Mazda | 9.8 hr | 9.8 to 9.8 | 8 |
| Pontiac | 9.8 hr | 9.8 to 9.8 | 8 |
| Nissan | 9.8 hr | 9.8 to 9.8 | 5 |
Other engine repairs
- Head Gasket - Single
- Intake Manifold Gasket
- Oil Change
- Valve Cover Gasket - Single
- PCV Valve
- Fan Belt Replacement
- Transmission Mount
- Oil Separator/PCV
- Full Engine Tune-Up
- Engine Mount - Rear
- Engine Mounts - All
- Engine R&R
Hours are flat-rate labor time: what a shop bills for the job when a professional technician does it. Figures come from the Open Labor Project database (how the data is built).