Truck Bed Liner labor time

2.4 hrtypical
1.1 to 3.5hours on most vehicles
$360typical labor at $150/hr

Truck Bed Liner takes about 2.4 hr of shop labor on a typical vehicle. Across 4,858 vehicle and engine combinations from 29 makes, most fall between 1.1 and 3.5 hours, and the longest take up to 4.5 hours. Chevrolet, GMC and Dodge vehicles tend to take the longest; Porsche, Hyundai and Suzuki the least. The exact time depends on your car, so look yours up below or pick it on the home page.

per hour

Enter a rate to see the labor cost of each job. Many US shops charge somewhere between $100 and $200 an hour.

At $150 an hour, labor for this job is usually $165 to $525, about $360 on a typical vehicle. Parts are extra.

How long it takes across all vehicles

Hours, in half hour steps. Each bar is how many vehicle and engine combinations fall in that range.

Truck Bed Liner time on popular vehicles

Truck Bed Liner time by make

MakeTypicalMost vehiclesVehicles
Chevrolet3.5 hr2.0 to 3.5997
GMC3.5 hr2.0 to 3.5844
Dodge3.5 hr2.0 to 4.5710
Cadillac3.1 hr3.1 to 3.110
Tesla2.6 hr1.5 to 3.514
Jeep2.4 hr2.0 to 3.5115
Ram2.3 hr0.8 to 2.4301
Nissan2.3 hr2.0 to 3.5155
Ford2.0 hr1.0 to 3.51,095
Toyota2.0 hr2.0 to 3.5205
Mazda2.0 hr2.0 to 2.0138
Isuzu2.0 hr2.0 to 3.555
Mitsubishi2.0 hr2.0 to 2.042
Fiat2.0 hr2.0 to 2.027
Plymouth2.0 hr2.0 to 2.425
Honda2.0 hr2.0 to 2.019
Volkswagen2.0 hr0.6 to 2.019
Rivian2.0 hr2.0 to 2.018
Subaru2.0 hr2.0 to 2.311
Studebaker2.0 hr2.0 to 2.410
Suzuki2.0 hr2.0 to 2.08
Hyundai2.0 hr2.0 to 2.37
Porsche0.6 hr0.6 to 2.619

Other body repairs

Hours are what a professional technician takes with the right tools, the same way shops quote jobs. Figures come from the Open Labor Project database.