12V Auxiliary Battery labor time
12V Auxiliary Battery takes about 0.7 hr of shop labor on a typical vehicle. Across 996 vehicle and engine combinations from 32 makes, most fall between 0.5 and 0.7 hours. Tesla, Mercedes-Benz and Porsche vehicles tend to take the longest; Dodge, Fiat and Mini the least. The exact time depends on your car, so look yours up below or pick it on the home page.
Enter a rate to see the labor cost of each job. Many US shops charge somewhere between $100 and $200 an hour.
At $150 an hour, labor for this job is usually $75 to $105, about $105 on a typical vehicle. Parts are extra.
How long it takes across all vehicles
Hours, in half hour steps. Each bar is how many vehicle and engine combinations fall in that range.
12V Auxiliary Battery time by make
| Make | Typical | Most vehicles | Vehicles |
|---|---|---|---|
| Tesla | 0.7 hr | 0.7 to 0.7 | 131 |
| Mercedes-Benz | 0.7 hr | 0.7 to 0.7 | 102 |
| Porsche | 0.7 hr | 0.7 to 0.7 | 93 |
| Audi | 0.7 hr | 0.7 to 0.7 | 65 |
| BMW | 0.7 hr | 0.7 to 0.7 | 58 |
| Cadillac | 0.7 hr | 0.7 to 0.7 | 19 |
| Volvo | 0.7 hr | 0.7 to 0.7 | 17 |
| Lincoln | 0.7 hr | 0.7 to 0.7 | 7 |
| Genesis | 0.7 hr | 0.7 to 0.7 | 5 |
| Hyundai | 0.5 hr | 0.5 to 0.5 | 59 |
| Ford | 0.5 hr | 0.5 to 0.5 | 56 |
| Kia | 0.5 hr | 0.5 to 0.5 | 56 |
| Rivian | 0.5 hr | 0.5 to 0.5 | 46 |
| Polestar | 0.5 hr | 0.5 to 0.5 | 42 |
| Nissan | 0.5 hr | 0.5 to 0.5 | 38 |
| Chevrolet | 0.5 hr | 0.5 to 0.5 | 35 |
| Volkswagen | 0.5 hr | 0.5 to 0.5 | 34 |
| Toyota | 0.5 hr | 0.5 to 0.5 | 26 |
| Lucid | 0.5 hr | 0.5 to 0.5 | 24 |
| GMC | 0.5 hr | 0.5 to 0.5 | 21 |
| Honda | 0.5 hr | 0.5 to 0.5 | 13 |
| Mini | 0.5 hr | 0.5 to 0.5 | 11 |
| Fiat | 0.5 hr | 0.5 to 0.5 | 7 |
| Dodge | 0.5 hr | 0.5 to 0.5 | 6 |
Other ev battery repairs
- High Voltage Battery Pack R&R
- Battery Cooling System Service
- DC-DC Converter
- High Voltage Battery Module R&R
- Battery Disconnect Service
- Battery Management System (BMS)
- Battery Junction Box
- Battery Thermal Management Module
Hours are flat-rate labor time: what a shop bills for the job when a professional technician does it. Figures come from the Open Labor Project database (how the data is built).