Battery Thermal Management Module labor time
Battery Thermal Management Module takes about 4.6 hr of shop labor on a typical vehicle. Across 990 vehicle and engine combinations from 31 makes, most fall between 3.5 and 4.6 hours, and the longest take up to 5.2 hours. Tesla, Mercedes-Benz and Porsche vehicles tend to take the longest; Fiat, Mini and Honda the least. The exact time depends on your car, so look yours up below or pick it on the home page.
Enter a rate to see the labor cost of each job. Many US shops charge somewhere between $100 and $200 an hour.
At $150 an hour, labor for this job is usually $525 to $690, about $690 on a typical vehicle. Parts are extra.
How long it takes across all vehicles
Hours, in half hour steps. Each bar is how many vehicle and engine combinations fall in that range.
Battery Thermal Management Module time by make
| Make | Typical | Most vehicles | Vehicles |
|---|---|---|---|
| Tesla | 4.6 hr | 4.6 to 4.6 | 131 |
| Mercedes-Benz | 4.6 hr | 4.6 to 4.6 | 102 |
| Porsche | 4.6 hr | 4.6 to 5.2 | 93 |
| Audi | 4.6 hr | 4.6 to 4.6 | 65 |
| BMW | 4.6 hr | 4.6 to 4.6 | 58 |
| Cadillac | 4.6 hr | 4.6 to 4.6 | 19 |
| Volvo | 4.6 hr | 4.6 to 4.6 | 17 |
| Lincoln | 4.6 hr | 4.6 to 4.6 | 7 |
| Genesis | 4.6 hr | 4.6 to 4.6 | 5 |
| Hyundai | 3.5 hr | 3.5 to 3.5 | 59 |
| Ford | 3.5 hr | 3.5 to 3.5 | 56 |
| Kia | 3.5 hr | 3.5 to 3.5 | 56 |
| Rivian | 3.5 hr | 3.4 to 3.5 | 46 |
| Polestar | 3.5 hr | 3.5 to 3.5 | 42 |
| Nissan | 3.5 hr | 3.5 to 3.5 | 38 |
| Chevrolet | 3.5 hr | 3.5 to 3.5 | 35 |
| Volkswagen | 3.5 hr | 3.5 to 3.5 | 34 |
| Toyota | 3.5 hr | 3.5 to 3.5 | 26 |
| Lucid | 3.5 hr | 3.5 to 3.5 | 24 |
| GMC | 3.5 hr | 3.5 to 3.5 | 21 |
| Honda | 3.5 hr | 3.5 to 3.5 | 13 |
| Mini | 3.5 hr | 3.5 to 3.5 | 11 |
| Fiat | 3.5 hr | 3.5 to 3.5 | 7 |
Other ev battery repairs
- High Voltage Battery Pack R&R
- Battery Cooling System Service
- DC-DC Converter
- High Voltage Battery Module R&R
- Battery Disconnect Service
- Battery Management System (BMS)
- 12V Auxiliary Battery
- Battery Junction Box
Hours are flat-rate labor time: what a shop bills for the job when a professional technician does it. Figures come from the Open Labor Project database (how the data is built).